Industrial Control
#01Prototype and Small-Batch Delivery for Industrial Controller Harness
Challenge: The project involved multiple interfaces and complex wire mapping under tight prototype timing.
Solution: Process cards and fixture-assisted operations enabled fast soldering with continuity test loops.
Result: Prototype passed in first round and moved to small-batch with reduced lead time.
